Disclaimer: We may earn a commission if you make any purchase by clicking our links. Please see our detailed guide here.

Follow us on:

Google News
Whatsapp

NASA’s Moon Rocket Core Stage Engine Retest Successful

Rahul Bhagat
Rahul Bhagat
Rahul Bhagat is a Digital Marketer and strategist with more than 7 years of experience in Marketing, SEO, Analytics, Marketing Automation and more.

Join the Opinion Leaders Network

Join the Techgenyz Opinion Leaders Network today and become part of a vibrant community of change-makers. Together, we can create a brighter future by shaping opinions, driving conversations, and transforming ideas into reality.

After replacing faulty control mechanisms, the US space agency said that all core stage rocket engines on NASA’s moon rocket have performed successfully in a recent series of tests.

Last month, a faulty controller on the RS-25 engine number 4 forced NASA to delay its upcoming Artemis I uncrewed moon mission.

The mission aims to mark the beginning of humanity’s return to the moon.

All four engine controllers performed as expected during power up, as part of the Artemis I Core Stage engineering tests, – NASA said in a statement.

The RS-25 engines are manufactured by US-based Aerojet Rocketdyne.

There are four RS-25 engines powering the core stage of the Space Launch System (SLS) moon rocket.

TheA company conducted numerous tests on the faulty engine four controllers and determined the cause to be a faulty memory chip.

The device is used only during the controller start-up sequence and has no impact on controller operations beyond that point. Further, the mission engineers found no indication of faulty memory chips on the other three engines, and therefore there are no related constraints to the wet dress rehearsal or launch, NASA said.

The fault, however, forced NASA to postpone the Artemis I launch to no earlier than April.

Meanwhile, teams at Kennedy Space Center in Florida are completing the remaining SLS pre-flight diagnostic tests and hardware closeouts, including testing the flight termination system and installing instrumentation on the twin solid rocket boosters.

After that the rocket and spacecraft will be rolled to Launch Pad 39B for the first time in March for a final wet dress test before launch.

During this test, the launch team will fuel the rocket and run through the pre-launch sequence all the way to the countdown.

Following the success of the test, NASA said it will fix a date for the mission launch.

Join 10,000+ Fellow Readers

Get Techgenyz’s roundup delivered to your inbox curated with the most important for you that keeps you updated about the future tech, mobile, space, gaming, business and more.

Recomended

Partner With Us

Digital advertising offers a way for your business to reach out and make much-needed connections with your audience in a meaningful way. Advertising on Techgenyz will help you build brand awareness, increase website traffic, generate qualified leads, and grow your business.

Power Your Business

Solutions you need to super charge your business and drive growth

More from this topic